Greenford new build 1a

Completed: January 2024 | Location: Leeds | Duration: 3 weeks

The Chorleywood House renovation brought new life to the property through a series of carefully executed upgrades. The work focused on improving functionality, comfort, and long‑term durability while maintaining the home’s character.

Outside Walkway

  • Installed a clean, durable walkway to enhance the home’s entrance
  • Improved drainage and surface stability for year‑round use
  • Selected materials that complement the exterior design

Kitchen Parquet Flooring

  • Laid high‑quality parquet flooring for a warm, elegant finish
  • Ensured precise leveling and alignment for a seamless look
  • Applied protective treatments for moisture and wear resistance

Basement Boiler Room

  • Renovated and organized the boiler room for improved safety and accessibility
  • Updated structural elements to support mechanical systems
  • Optimized layout for maintenance and future upgrades

Floor Heating Installation

  • Integrated underfloor heating for consistent, energy‑efficient warmth
  • Coordinated installation across key living areas
  • Ensured proper insulation and system testing for reliable performance
← Back to Projects