Completed: January 2024 | Location: GreenFord | Duration: 6 weeks

The new building project represents a modern, functional, and thoughtfully designed structure aimed at meeting both current and future needs. Throughout the construction process, multiple teams contributed to different phases of the build, ensuring high-quality craftsmanship and attention to detail.

Our Team’s Contribution

Our team played a key role in three major components of the construction:

Roof Installation

  • Constructed a durable and weather‑resistant roofing system
  • Ensured proper insulation and ventilation for long‑term performance
  • Used high‑quality materials to enhance energy efficiency and structural integrity

Staircase Construction

  • Built a sturdy and safe staircase connecting the building’s levels
  • Focused on ergonomic design and comfortable step dimensions
  • Integrated materials that match the building’s overall aesthetic

Bathroom Construction

  • Completed full bathroom installation, including plumbing and fixtures
  • Ensured waterproofing and moisture control for long‑lasting reliability
  • Delivered a clean, modern finish with functional layout and quality materials